|
Product Detail :
|
UNDER FRAME COMPLETE FOR LHB GS(EOG) COACHES. . * UNDER FRAME COMPLETE FOR LHB GS(EOG) COACHES Note-(1) PROTECTION PROCEDU
RE AS PER DY CPLE-III ANNEXURE-APP DATED 14/05/2024. Note-(2).MOUNTING ARRANGEMENT ON UN
DERFRAME FOR BIOLOGICAL TANK AS PER DRG No. LE11442 ALT f ., as per Drawing LG11265 ALTj
& AS PER SCHEDULE OF TECHNICAL REQUIREMENT SPECIFICATION NO. MDTS21320 REV-02 DATED 09
.06.2020 & MASKING AS PER DRG. NO. MI007679 ALT.nil NOTE 1. SUPPORTING MEMBER ON TROUG
H FLOOR will be applicable as per DRG.NO. MI006839 ALTd., Packing Instruction PI042. [ Warranty
Period 84 Months after the date of delivery ] ]
|
| Tender Detail : |
UNDER FRAME COMPLETE FOR LHB GS(EOG) COACHES. |