Product Detail :
|
A/mtc. Water Supply Scheme Phase-1 to 11 and Sector-70-71, Repair of Leakage in 6’ I/d & 4’ I/d A.c. Pipe Line Including Earth Work, Bailing Out Water From Trenches, Dismanting, Providing and Fixing Ci D-joint with Nut and Bolt, Pvc Pipe, Refitting and Filling the Site After Repair Complete Job.
|